Gohoran Compost yard
Gohoran Compost yard in Abik, with an annual production capacity of 52,000 tons of Phase I compost, 36,000 tons of Phase II and 11,000 tons of Phase III compost, was fully calculated and designed by the PS Group in 1403 and will be implemented in two phases.
Project Details
Scope of deliveryProject Details
- In the first phase, bunkers of Phase I will be implemented, and in the second phase, tunnels of Phase II and III.
- This yard will have 5 bunkers of 330 tons of Phase I and 6 tunnels of 150 tons of Phase II and III.
Implementation of Phase One Work
- Spigots and aeration floor
- Engineering, design and construction drawings
- All aerators of Phase 1
- All control systems of Phase 1
- Fully mechanized mixing line, including: Straw hopper, Chicken manure hopper, Compost transfer conveyor belt, Inclined transfer conveyor belt, Conveyor belt for transferring compost to the filling cassette, Filling cassette
- Supervision of the construction and commissioning of the bunkers
The PS Group
Learn more about Parsspawn
The PS Group is the exclusive representative of the Christiaens Group in the Middle East. With over 20 years of experience in compost production and mushroom cultivation, we provide our customers with state-of-the-art engineering at the highest level.
About ParsspawnContact
Let's get in touch
Explore partnership possibilities with us. Together we can lift your business in the Middle East to the next level.
RESPONSE WITHIN 2 BUSINESS DAYS
EN · TR · FA
EN · TR · FA
Message sent
We'll be in touch.