Gohoran Compost yard — Parsspawn project

Project

Gohoran Compost yard

Gohoran Compost yard in Abik, with an annual production capacity of 52,000 tons of Phase I compost, 36,000 tons of Phase II and 11,000 tons of Phase III compost, was fully calculated and designed by the PS Group in 1403 and will be implemented in two phases.

Project Details

Scope of delivery

Project Details

  • In the first phase, bunkers of Phase I will be implemented, and in the second phase, tunnels of Phase II and III.
  • This yard will have 5 bunkers of 330 tons of Phase I and 6 tunnels of 150 tons of Phase II and III.

Implementation of Phase One Work

  • Spigots and aeration floor
  • Engineering, design and construction drawings
  • All aerators of Phase 1
  • All control systems of Phase 1
  • Fully mechanized mixing line, including: Straw hopper, Chicken manure hopper, Compost transfer conveyor belt, Inclined transfer conveyor belt, Conveyor belt for transferring compost to the filling cassette, Filling cassette
  • Supervision of the construction and commissioning of the bunkers

Project impressions

01 / 08

The PS Group

Learn more about Parsspawn

The PS Group is the exclusive representative of the Christiaens Group in the Middle East. With over 20 years of experience in compost production and mushroom cultivation, we provide our customers with state-of-the-art engineering at the highest level.

About Parsspawn

Contact

Let's get in touch

Explore partnership possibilities with us. Together we can lift your business in the Middle East to the next level.

RESPONSE WITHIN 2 BUSINESS DAYS
EN · TR · FA

Protected by Cloudflare Turnstile · We handle your data per our privacy policy.